top of page

GEOVERT Ground Engineering Projects

Stabilising Slopes, Securing Success

anchor installation bridge seismic strengthening nz

Cuba Street Bridge Strengthening Works | NZ

Enhancing seismic resilience through anchor installation and structural improvements

cotter dam grouting and drainage works

Cotter Dam Foundations & Drainage | AUS

Complex foundation grouting and drainage works for Australia’s tallest RCC dam

erdox avalanche barrier installation avalanche protection

Park City Erdox Avalanche Barrier Installation | USA

Repair and reinstatement of 216 Erdox avalanche barriers in alpine terrain above Park City, Utah

geobeam foundation system transmission tower

Rockhampton Transmission Towers Micropile Foundation Upgrade | AUS

Foundation retrofitting using micropile-based GEOBEAM system under live tower conditions

slope stabilisation in extreme ground conditions

Ngaio Gorge Slope Stabilisation

Multi-system stabilisation of three major slip sites delivered in extreme ground conditions

soil nail and shotcrete retaining walls for rail extension australia

Seaford Rail Extension Retaining Walls | AUS

Design and construction of complex soil nail and shotcrete retaining walls for a major rail extension

crane basket shotcrete application eastern hutt

Eastern Hutt Road Slope Stabilisation

Rope access, crane basket drilling, and mesh systems to secure a major Wellington transport corridor

gazex installation remote avalanche protection system

Blue Point & Mother Cline Avalanche Protection | USA

Installation of remote avalanche control systems at 12,000ft to protect highway from recurring slide paths

rock anchor installation dam spillway upgrade

Murchison Dam Spillway Upgrade | AUS

Passive rock anchor installation to enhance spillway safety and resilience

remote avalanche control system installation

Kachina Peak Avalanche Protection | USA

Design and installation of fixed GAZEX avalanche control systems at 12,000ft

residential slope stabilisation nz

Sharon Road Residential Slope Stabilisation | NZ

Design and construct residential slope stabilisation solution following major rainfall-induced slips

soil nail retaining wall construction nz

Takitimu North Link – 15th Avenue Soil Nail Retaining Wall | NZ

Retaining wall construction enabling progress on the Takitimu North Link Stage 1 expressway

Anchored mesh and shotcrete slope stabilisation

Lennel Road Slope Stabilisation | NZ

Anchored mesh and shotcrete wall solution in constrained urban environment

micropile installation in confined space

Barrington Mall Micropiles | NZ

Micropile installation for seismic upgrades in a confined retail environment

marine pipeline maintenance

Red Mud Marine Pipeline Maintenance | AUS

Maintenance and corrosion protection works on tidal inlet pipeline support structures

emergency slope stabilisation nz

Pukerua Bay Slope Stabilisation | NZ

Rapid slope stabilisation to restore access on state highway after major slip

rock anchors installation hydro-electric facility

Kidston Pumped Storage Hydro Rock Anchors | AUS

Installation of rock anchors in cavern at remote hydro-electric facility

overhang removal above great ocean road

Cumberland River Overhang Removal | AUS

Overhang removal and temporary rockfall protection works on the Great Ocean Road.

drilling for slope stabilisation nz

Kaikoura SH1 Slip 15 Slope Stabilisation | NZ

Active mesh and anchoring system installed to stabilise post-earthquake slopes above highway tunnels

high reach drill rope access drilling

M1 Pacific Highway Geohazard Mitigation | AUS

Rockfall protection and slope stabilisation on major transport corridor

bottom of page