top of page

GEOVERT Asset Integrity Maintenance Projects

Keeping Critical Infrastructure Moving

Dropped object prevention system installed using façade-mounted netting NZ

Clandeboye Facade Netting | NZ

Dropped object prevention system installed using façade-mounted netting.

confined space inspections and repairs

Whareroa Shutdown Confined Space Inspections and Repairs | NZ

Confined space inspections and repairs delivered within tight winter shutdown

eoncoat application coastal export facility

Abbot Point Export Facility Eoncoat Application | AUS

Innovative corrosion-resistant coating applied to extend service life of coastal export facility

marine pipeline maintenance

Red Mud Marine Pipeline Maintenance | AUS

Maintenance and corrosion protection works on tidal inlet pipeline support structures

dairy plant maintenance nz

Waitoa Dairy Plant Maintenance | NZ

Curtain wall replacement and airtightness upgrades delivered under time-critical conditions

bridge inspection and repair on road bridge nz

SH1 Rakaia Bridge Maintenance | NZ

Concrete inspection and repair works on road bridge using alternative access methods

rope access wear liner inspection

RIO Tinto Wear Liner Inspection | AUS

Rope access inspection of wear liners to support shutdown planning and maintenance optimisation

double brick chimney stack

QAL Chimney Stacks | AUS

Structural integrity survey of a 60m brick chimney stack using specialist access and testing methods

rope access gas pipeline maintenance Australia

QAL Gas Main Remediation | AUS

Gas main remediation works delivered safely at height within an active alumina refinery

rope access shutdown maintenance for mining

Boddington Gold Mine Maintenance Shutdown | WA, AUS

Shutdown support completed within expanded scope and tight timeframe

rope access concrete repairs New Zealand

SH1 Ashburton Bridge Maintenance | NZ

Concrete repair works on a bridge spanning an ecologically sensitive river

industrial asset integrity maintenance Queensland

Yarwun Alumina Refinery Asset Integrity Maintenance | AUS

Site-wide asset integrity and maintenance services for refinery infrastructure

TPO membrane and flashing system installation nz

Fonterra Clandeboye TPO Installation | NZ

TPO membrane and flashing system installed to achieve permanent waterproofing

tank inspection using rope access

RIO Tinto Alcan Yarwun Tank Inspection | AUS

Statutory inspection and repair of evaporation flash tanks using rope access NDT teams

tensioned netting containment for blasting works

Hutt River Estuary Bridge Repairs | NZ

Corrosion management and protective coating works beneath a 170m bridge span

bottom of page