  • Completed the installation safely and ahead of schedule despite adverse conditions

  • Delivered a fully engineered and rated DROPS system with minimal structural impact

  • Provided long-term protection against dropped-object risks with validated reliability

Project

Solution

  • Designed and installed a large-scale lightweight nylon netting system anchored to the façade

  • Engineered anchoring solution, including magnetic drilling through 200mm box sections

  • Applied exterior waterproofing and flashing to ensure long-term integrity of the system

  • Third-party engineering analysis and rating to verify compliance and safety performance

Project

Challenges

  • Installation restricted to a shutdown period, with a narrow winter maintenance window

  • Proximity to blast doors and high-pressure steam piping required precise planning

  • Adverse weather conditions throughout winter increased complexity and safety considerations

Dropped object prevention system installed using façade-mounted netting NZ

Project

Overview

At Fonterra’s Clandeboye site in Canterbury, poly façade panels presented a significant dropped-object risk to both personnel and equipment. Geovert was engaged to design and implement a tailored DROPS (Dropped Object Prevention Scheme) solution to mitigate the hazard. The work required careful planning to suit the existing building infrastructure, while managing operational constraints and adverse winter weather.

Clandeboye Facade Netting | NZ

Dropped object prevention system installed using façade-mounted netting.