Results

  • Full project delivered with zero operational downtime

  • Maintained complete environmental compliance

  • Reinforced QAL’s trust in Geovert as a preferred maintenance partner

  • Showcased the effectiveness of rope access in high-risk infrastructure work

Project

Solution

  • Scaffold and custom environmental encapsulation designed to enclose the elevated pipe safely

  • Abrasive blasting carried out within containment to avoid contamination

  • Protective coating applied using airless spray systems for speed and quality

  • All work executed under Geovert’s rope access protocols for safe, agile operations

Project

Challenges

  • Live gas main remained in operation for 100% of the works

  • Access complexity due to height and proximity to other structures

  • Strict environmental and contamination control requirements

rope access gas pipeline maintenance Australia

Project

Overview

Queensland Alumina Limited (QAL) is one of the largest alumina refineries in Australia, producing 3.80 million tonnes of smelter-grade alumina annually. Geovert has been a long-term shutdown and maintenance partner at the site for over a decade, delivering a range of critical inspection, blasting, and coating services.


In this project, QAL required a 350m-long gas main to be remediated through abrasive blasting and protective coating - while remaining fully operational. Located at height and surrounded by active infrastructure, the works required exceptional precision, containment, and planning.

QAL Gas Main Remediation | AUS

Gas main remediation works delivered safely at height within an active alumina refinery