Remote Access Construction

Specialised construction methods for alpine projects in remote and high-elevation terrain.

Remote alpine environments often present extreme challenges for construction, from limited access and steep slopes to short seasonal windows. Geovert specialises in delivering works where traditional methods are not possible. Our crews use heavy-lift helicopters, rope access, and custom alpine equipment to transport materials, install foundations, and assemble structures safely in otherwise inaccessible areas. 


This expertise enables the delivery of avalanche protection systems and other critical mountain infrastructure without compromising safety, schedule, or environmental standards.


Benefits:

  • Enables safe construction in remote or high-elevation alpine terrain

  • Heavy-lift helicopter capability for rapid material transport

  • Specialist equipment and rope access for steep, inaccessible slopes

  • Proven performance within short alpine construction seasons

  • Reduces environmental impact by minimising ground disturbance

remote access alpine construction avalanche protection

Remote Access Construction

In Action.

slope stabilisation taparahi bridge works nz

SH25A Taparahi Bridge Slope Stabilisation | NZ

Fast-tracked slope stabilisation for critical bridge link on the Coromandel Peninsula
active mesh installation for slope stabilisation nz

Kaikoura SH1 Slip 3 Slope Stabilisation | NZ

Anchored mesh system installed to stabilise earthquake-induced slip above a live highway
innovative crane basket drilling slope stabilisation

Peacocke Road - Waikato Bridge Soil Nails | NZ

Innovative platform drilling and silt containment to enable bridge works over the Waikato River
debris flow barriers geohazard mitigation nz

Plimmerton Debris Flow Barriers | NZ

Installation of Geobrugg VX debris flow barriers in the Karehana Bay Scenic Reserve following 2020 storms
erdox avalanche barrier installation avalanche protection

Park City Erdox Avalanche Barrier Installation | USA

Repair and reinstatement of 216 Erdox avalanche barriers in alpine terrain above Park City, Utah
gazex installation remote avalanche protection system

Blue Point & Mother Cline Avalanche Protection | USA

Installation of remote avalanche control systems at 12,000ft to protect highway from recurring slide paths
remote avalanche control system installation

Kachina Peak Avalanche Protection | USA

Design and installation of fixed GAZEX avalanche control systems at 12,000ft
lattice transmission tower construction nz

Woosh Wireless Transmission Tower Construction | NZ

Lattice towers delivered end-to-end: fabrication, foundations, and erection
installation of GAZEX

Jackson Hole Mountain Resort Avalanche Protection | USA

Installation and foundation works for GAZEX avalanche exploders at high elevation
drill and blast above homer tunnel

Homer Tunnel Geohazard Mitigation | NZ

Drill and blast removal of a 2,000t unstable rock mass above the Homer Tunnel, Milford Sound
slope stabilisation above active scenic rail line

Kuranda Scenic Rail Slope Stabilisation | AUS

Design-build slope-stabilisation program safeguarding heritage rail infrastructure within a World Heritage Park
gazex installation at altitude

CDOT Avalanche Protection | USA

Avalanche control systems installed at 12,000 ft to protect state highway users

Ready to Tackle the Impossible?

Whether it’s stabilising critical transport corridors, protecting mining assets, or managing natural hazard risks, Geovert is trusted to deliver when failure is not an option.