top of page

Rock Scaling & Block Removal

Safe removal of unstable blocks and loose rock to prevent uncontrolled failures.

Scaling is a critical hazard removal method used to dislodge unstable rock before failure. Geovert’s rope access and mechanical scaling teams safely remove blocks using airbags, jacks, and scaling bars. With extensive emergency response experience, we deploy quickly to make high-risk slopes safe, protecting crews, infrastructure, and operations.


Benefits:

  • Removes unstable rock before uncontrolled failure

  • Rope and mechanical scaling for different site needs

  • Proven record in emergency response and disaster recovery

manual scaling and block removal rope access

Rock Scaling & Block Removal

In Action.

slope stabilisation emergency landslip works australia

Kuranda Range Road Emergency Works | AUS

Slope stabilisation delivered under extreme conditions to maintain access on a critical transport route
hoover dam rockfall mitigation

Hoover Dam Rockfall Protection | USA

Rockfall mitigation works to protect the iconic Hoover Dam with "exceptional" safety performance
rockfall attenuator installation above main highway

Cumberland River Attenuator | AUS

Construction of the first fully stainless steel rockfall attenuator in Australia and New Zealand
rockfall mesh installation on great ocean road

Great Ocean Road Rockfall Mesh | AUS

Rockfall mesh installation to stabilise weathered cuttings along the Great Ocean Road.
rope access rockfall mitigation dam infrastructure

Yellowtail Dam Ice and Rockfall Mitigation | USA

Rockfall and icefall protection systems safeguarding dam infrastructure and operations
rail stabilisation ground anchors

Roy Hill Rail Slope Stabilisation | AUS

Anchor installation to stabilise a rail slope hazard during a scheduled shutdown
geohazard mitigation seminoe dam

Seminoe Dam Rockfall Protection | USA

Restoring safe access to spillway and stabilising slopes with anchors and mesh.
overhang removal above great ocean road

Cumberland River Overhang Removal | AUS

Overhang removal and temporary rockfall protection works on the Great Ocean Road.
high reach drill rope access drilling

M1 Pacific Highway Geohazard Mitigation | AUS

Rockfall protection and slope stabilisation on major transport corridor
rockfall mitigation and scaling usa

Yellowstone Park Rockfall Mitigation | USA

Emergency rockfall mitigation works delivered to protect infrastructure following severe rainfall events
rockfall attenuator construction nz

Kaikoura SH1 Slip 14 Rockfall Attenuator | NZ

Design and construction of a 2000kJ rockfall attenuator in post-earthquake slip zone
puhoi to warkworth slope stabilisation spider excavator

Puhoi to Warkworth Slope Stabilisation | NZ

Stabilisation of steep rock cuttings up to 50m high on the Puhoi to Warkworth motorway extension.
drill and blast above homer tunnel

Homer Tunnel Geohazard Mitigation | NZ

Drill and blast removal of a 2,000t unstable rock mass above the Homer Tunnel, Milford Sound
slope stabilisation rockfall protection

Victoria University Slope Stabilisation | NZ

Anchored mesh system to stabilise earthquake-affected slopes behind a university building
slope stabilisation works

Grassy Creek Slope Stabilisation | AUS

Geotechnical investigation, anchor testing, and slope stabilisation works for VicRoads
riverbank stabilisation with soil nails nz

Waikato River Stabilisation Project | NZ

Soil nailing works to stabilise riverbanks and protect critical walkways
Rock removal, anchoring, and mesh installation for slope stabilisation

Sheoak Falls Rockfall Netting | AUS

Rock removal, anchoring, and mesh installation to stabilise multiple slips along a coastal highway

Ready to Tackle the Impossible?

Whether it’s stabilising critical transport corridors, protecting mining assets, or managing natural hazard risks, Geovert is trusted to deliver when failure is not an option.

bottom of page