top of page

Site-Specific Hazard Assessment & Risk Mitigation

Detailed slope hazard assessments with targeted mitigation strategies for mining operations.

Our teams conduct detailed hazard assessments to identify and prioritise risks, ensuring targeted mitigation strategies are applied. Using geotechnical monitoring, inspections, and modelling, we design tailored controls such as barriers, anchors, or drainage improvements. This proactive approach reduces uncertainty, prevents costly disruptions, and helps maintain compliance with strict safety standards.


Benefits:

  • Identifies and addresses site-specific geotechnical risks

  • Provides tailored mitigation strategies for safe operations

  • Reduces uncertainty, disruption, and compliance risks

hazard assessment risk mitigation ground support

Site-Specific Hazard Assessment & Risk Mitigation

In Action.

ground support crew for highwall stabilisation at mine

ATK Mine Highwall Stabilisation | KAZAKHSTAN

Fast-tracked highwall stabilisation under extreme conditions to restore mine productivity

high reach drill for ground support australia

Boddington Gold Mine Ground Support | AUS

Long-term Ground Support and bespoke High Reach Drill

erosion control for mining ground support extreme climate

Lihir Gold Mine Erosion Control Works | PNG

Erosion control program delivered under extreme tropical conditions

superboom drilling ground support

Detour Lake Mine Ground Support | CANADA

Specialised ground support installation preserving pit design and operational safety

wagon drilling rockfall mitigation at gold mine

Porgera Mine North Wall Rockfall Mitigation | PNG

Design–build rockfall protection combining attenuators, barriers and drape mesh to safeguard people and operations

wagon drilling rope access highwall stabilisation

West Angelas Highwall Stabilisation | AUS

Engineered highwall stabilisation enabling safe access to quarantined ore reserves

crusher pocket stabilisation

Sino Iron Ore Pockets Stabilisation | AUS

Emergency stabilisation of crusher pocket walls using cable bolts and specialised drilling methods

bottom of page