top of page

On-Site Geotechnical Design & Engineering

Real-time engineering expertise to adapt and optimise solutions on site.

We deliver on-site geotechnical engineering and design capability to support both planned and emergency works. We consult with engineers to assess ground conditions in real time, providing immediate input on slope stability, hazard risks, and safe support solutions. This design-build integration allows decisions to be made quickly and effectively, reducing delays.


Benefits:

  • Real-time geotechnical input for faster decision-making

  • Ensures engineered controls for all site works

  • Streamlines design-build delivery under one provider

design and engineering emergency response design build

On-Site Geotechnical Design & Engineering

In Action.

ground support crew for highwall stabilisation at mine

ATK Mine Highwall Stabilisation | KAZAKHSTAN

Fast-tracked highwall stabilisation under extreme conditions to restore mine productivity

erosion control for mining ground support extreme climate

Lihir Gold Mine Erosion Control Works | PNG

Erosion control program delivered under extreme tropical conditions

reinforced drape  system for rockfall protection

Super Pit Design Build Rockfall Protection | AUS

Design and installation of a reinforced drape system to manage rockfall risks in one of the world’s largest open cut gold mines

wagon drilling rope access highwall stabilisation

West Angelas Highwall Stabilisation | AUS

Engineered highwall stabilisation enabling safe access to quarantined ore reserves

rope access wagon drilling footwall stabilisation

Koolan Island Footwall Stabilisation | AUS

Stabilisation works to remediate a footwall failure in an active iron ore pit

crusher pocket stabilisation

Sino Iron Ore Pockets Stabilisation | AUS

Emergency stabilisation of crusher pocket walls using cable bolts and specialised drilling methods

anchor installation for mine dump pocket

Mesa-J Dump Pocket Anchor Installation | AUS

Anchor reinforcement and testing to strengthen a critical dump pocket wall

bottom of page