AWARD-WINNING ENGINEERING INNOVATION
High Reach Drill

WINNER
ENGINEERING SUCCESS OF THE YEAR · 2026

High-reach drilling for ground support and slope stabilisation.
Geovert's High Reach Drill (HRD) is a purpose-built drilling system for ground support and slope stabilisation in mining and civil infrastructure. Combining remote operation with interchangeable drilling capabilities, it services multiple drilling horizons from a single setup, accelerating bench turnover on open pit mines.
54%
BENCH TURNOVER
Up to 54% reduction in production bench turnover time.
5:1
MODELLED RETURN
Modelled return from investment in engineered ground support.
0
OPERATOR ROCKFALL EXPOSURE
Remote drilling from a protected cab keeps the operator out of the line of fire.
The problem it was built to solve
Where ground support is required, open pit production benches are commonly mined in 5 metre lifts, with ground support drilled, installed, grouted and cured after each one. A 15 metre bench means three interruptions to the mining sequence before it is complete.
Developed in collaboration with Newmont at Boddington Gold Mine, the HRD allowed the full 15 metre bench to be mined before ground support was installed across the whole batter, removing two of those three interruptions and accelerating bench turnover. Subsequent development has extended its capability significantly.

5m
STANDARD drill REACH
30m
HRD REACH
Fewer interruptions. Safer ground support.
Where the High Reach Drill works
One system. Different environments.

Open Pit Mining
Steeper walls, less waste.
The HRD drills the Strategic Ground Support that allows pit walls to be steepened. Steeper walls mean less waste to drill, blast, load and haul and less space given over to waste dumps, which can generate substantial savings over the life of a mine. Supported batters also improve safety on the walls themselves.
Civil & Infrastructure
More efficient slope stabilisation.
For civil infrastructure, the HRD provides a specialised solution for steep terrain, restricted access and areas exposed to rockfall hazards. Applications include engineered slope stabilisation, transport corridor protection and disaster recovery works.

Nine generations of development.
Since the first HRD entered operation in 2015, Geovert has continually refined its drilling technology, extending reach and introducing new capabilities in drilling methods, automation, remote operation and hydraulic systems.
26m

-
Top Hammer and Rotary Drilling
-
Full Rotation
-
Increased Automation
-
Remote Operation
-
Upgraded Power Systems
30m [ 2026 ]

-
Top Hammer and Rotary Drilling
-
Full Rotation
-
Remote Operation
-
Adaptable Drill Configuration
-
Road-Going
26m

-
Top Hammer and Rotary Drilling
-
Full Rotation
-
Remote Operation
-
Increased Automation
-
Performance Monitoring
18m [ 2015 ]

-
Hydraulic Rotary
21m

-
Hydraulic Top Hammer
-
Full rotation
-
Remote Operation
Define your drilling scenario.
Configure your site.
The HRD Configurator allows clients and project teams to explore a drilling scenario based on specific site requirements. Select batter height and angle, hole diameter, bar size, mobility type and power source, with a true-to-scale technical drawing updating as the configuration changes.