Results

  • Full coverage of the slope with tailored solutions for variable terrain conditions.

  • Long-term stability achieved through hybrid drilling and mesh systems.

  • Demonstrated Geovert’s adaptability and capability in restricted-access stabilisation projects.

Project

Solution

  • Applied dual-methodology construction using excavator-mounted drills for 66% of the area and rope-access-operated wagon drills for the remaining 33%.

  • Integrated steel mesh, erosion matting, and shotcrete to stabilise the slope face.

  • Utilised rope access technicians for drilling, installation, and quality assurance across restricted sections.

Project

Challenges

  • Severely limited access restricted equipment size and construction methods.

  • Varying terrain conditions required multiple drilling and installation approaches.

  • Safety and logistical complexity of working below occupied residential structures.

residential slope stabilisation works nz

Project

Overview

Geovert was commissioned to construct a rock anchor retaining wall system below the Blue Pacific Apartments to address a documented history of slope instability. The solution incorporated structural steel mesh, erosion control matting, and drilled drainage to provide a robust and permanent stabilisation outcome. Designed and delivered in close coordination with the geotechnical engineer, the works provided long-term assurance for the apartment complex above, mitigating risk in a challenging downslope environment with restricted access.

Blue Pacific Residential Apartments Slope Stabilisation | NZ

Integrated rock anchor and mesh system to restore long-term slope stability beneath coastal apartments