  • Project completed ahead of schedule with full compliance to design and safety standards.

  • Provided the client with a durable, kinetic-energy-rated protection system enhancing global motorsport safety credentials.

  • Strengthened Geovert’s reputation for precision installation of high-performance Geobrugg systems within complex timeframes.

Project

Solution

  • Mobilised a crew of rope-access technicians supported by telehandlers and knuckle-boom EWPs to complete the installation efficiently.

  • Installed three fence types incorporating 11 end posts, 48 middle posts, and 12 diagonal struts, pinned and wedged before final grouting for stability.

  • Followed Geobrugg’s installation procedures under direct oversight, ensuring optimal fence performance and certification.

Project

Challenges

  • Fixed shutdown period allowed no program extensions, demanding precise sequencing and resourcing.

  • Uneven terrain and limited ground access around high-speed corners restricted equipment placement.

  • Strict compliance with Geobrugg specifications and event-safety protocols required rigorous quality control.

phillip island circuit debris fence installation

Project

Overview

Geovert was commissioned to install Geobrugg debris fences at Turns 4 and 6 of the world-renowned Phillip Island Grand Prix Circuit. The works formed part of a safety-upgrade program designed to improve spectator and rider protection while aligning with international motorsport standards. 


All works were completed within the circuit’s limited off-season period, requiring careful planning to avoid disruption to scheduled events. A Geobrugg representative was present throughout construction to verify quality and compliance with manufacturer standards

Phillip Island Circuit Debris Fence Installation | AUS

Certified Geobrugg debris-fence installation delivered within tight racing-calendar shutdown window