top of page

Proyectos de GEOVERT

Enfrentando lo imposible

soil nail retaining wall construction nz

Takitimu North Link – 15th Avenue Soil Nail Retaining Wall | NZ

Retaining wall construction enabling progress on the Takitimu North Link Stage 1 expressway

shotcrete retaining wall beneath bridge victoria australia

Point Cook Road Intersection Upgrade | AUS

Low-headroom soil nailing and shotcrete retaining walls delivered beneath live bridge infrastructure

eoncoat application coastal export facility

Abbot Point Export Facility Eoncoat Application | AUS

Innovative corrosion-resistant coating applied to extend service life of coastal export facility

Anchored mesh and shotcrete slope stabilisation

Lennel Road Slope Stabilisation | NZ

Anchored mesh and shotcrete wall solution in constrained urban environment

micropile installation in confined space

Barrington Mall Micropiles | NZ

Micropile installation for seismic upgrades in a confined retail environment

marine pipeline maintenance

Red Mud Marine Pipeline Maintenance | AUS

Maintenance and corrosion protection works on tidal inlet pipeline support structures

emergency slope stabilisation nz

Pukerua Bay Slope Stabilisation | NZ

Rapid slope stabilisation to restore access on state highway after major slip

Perforación Wagon Drill mediante acceso por cuerda para estabilización de footwall

Estabilización de footwall en Koolan Island | Australia

Trabajos de estabilización para remediar una falla de footwall en un rajo activo de mineral de hierro.

rock anchors installation hydro-electric facility

Kidston Pumped Storage Hydro Rock Anchors | AUS

Installation of rock anchors in cavern at remote hydro-electric facility

overhang removal above great ocean road

Cumberland River Overhang Removal | AUS

Overhang removal and temporary rockfall protection works on the Great Ocean Road.

drilling for slope stabilisation nz

Kaikoura SH1 Slip 15 Slope Stabilisation | NZ

Active mesh and anchoring system installed to stabilise post-earthquake slopes above highway tunnels

high reach drill rope access drilling

M1 Pacific Highway Geohazard Mitigation | AUS

Rockfall protection and slope stabilisation on major transport corridor

dairy plant maintenance nz

Waitoa Dairy Plant Maintenance | NZ

Curtain wall replacement and airtightness upgrades delivered under time-critical conditions

slope stabilisation above live rail line

Black Mountain Cutting Remediation | AUS

Design-build slope stabilisation delivered on live coal rail infrastructure

Slope stabilisation using anchored mesh and shotcrete NZ

Brooklyn Terrace Slope Remediation | NZ

Slope stabilisation using anchored mesh and shotcrete within a constrained urban road corridor

bridge inspection and repair on road bridge nz

SH1 Rakaia Bridge Maintenance | NZ

Concrete inspection and repair works on road bridge using alternative access methods

slope stabilisation and rockfall protection along mountain road QLD

Mount Molloy Road Slope Stabilisation & Rockfall Protection | AUS

Integrated slope stabilisation and rockfall protection to maintain access along a critical mountain road

ground anchor and shotcrete stabilisation nz

Transmission Gully Cut 35 Stabilisation | NZ

Ground anchor and shotcrete underpinning to protect a critical transmission tower above highway excavations

Anchored shotcrete retaining wall construction using high-reach drilling at mine portal

Underground Mine Portal Stabilisation | US

Anchored shotcrete retaining wall construction using high-reach drilling to stabilise an operational mine portal.

Ground anchoring, soil nailing and shotcrete stabilisation to support bridge replacement NZ

SH29 Omanawa Bridge Replacement Ground Stabilisation | NZ

Ground anchoring, soil nailing and shotcrete stabilisation to support major bridge replacement and highway realignment works

bottom of page