top of page

Recursos

Nuestro centro de conocimiento

Últimas noticias desde la sala de prensa

Desde la sala de prensa

Casos de estudio

Geovert truck at the Hoover Dam US

Geovert at Hoover Dam - Safety and Accountability at an Iconic Site

Geovert has been delivering rockfall mitigation and geotechnical services at the Hoover Dam for the US Bureau of Reclamation since 2019. This case study looks at what working at one of the world's most recognised infrastructure sites demands, and what years of sustained performance there demonstrates about how our team operates.

Perforación con wagon drill de Geovert en talud de banco de la mina West Angelas

Cómo se ve un buen resultado: diseño y construcción para estabilización de talud de banco

Una inestabilidad a escala de múltiples bancos en la mina de mineral de hierro West Angelas de Rio Tinto bloqueó el acceso a mineral de alta ley ubicado debajo. El enfoque de diseño y construcción de Geovert utilizó construcción descendente mediante acceso por cuerda para instalar un sistema de malla anclada y estabilizar de forma segura el talud de banco.

lennel road wellington slope stabilisation above road

Slope Stabilisation in a Constrained Urban Environment, Wellington NZ

A technically demanding urban slope stabilisation for Wellington City Council, requiring a purpose-built scaffold system, three drilling methods in combination, and asbestos management, all with a live road below

rockfall barrier at fremont canyon

What Good Looks Like: Fremont Canyon Design and Construct Rockfall Protection

Replacing 60-year-old rockfall barriers at Fremont Canyon required working within location constraints that defined every solution, from the custom lower barrier to the zip-line system that removed 700 cubic yards of debris.

brynderwyn hills resilience project downslope slope stabilisation

What Good Looks Like: Slope Stabilisation at Brynderwyn Hills Resilience Project

When severe weather closed Northland's main highway, the initial emergency response evolved into an 18-month resilience project built on early collaboration.

geovert crane suspended drilling platform

Geotechnical Access Innovation: The Waikato River Bridge Soil Nails Project

When Hamilton's new Waikato River Bridge required slope stabilisation on a sheer 30-metre embankment above New Zealand's longest river, Geovert developed the country's first crane-suspended drilling platform for geotechnical construction.

Fundamentos Geovert - Biblioteca temática

High-Reach Drilling Solutions for Slope Stabilisation

High-Reach Drilling Solutions for Slope Stabilisation

Innovative equipment design enables safer and more efficient slope stabilisation, especially in hard-to-access slopes

GAZEX installation by Geovert at Jackson Hole Mountain Resort

Implementing Remote Avalanche Mitigation: Constructor and Manufacturer Insights

Remote avalanche mitigation systems have transformed how operators manage avalanche risk. This collaborative article with MND explores GAZEX™ and O'BELLX™ technology, implementation considerations for extreme mountain environments, and how manufacturer-constructor partnerships deliver effective avalanche control solutions.

landslide at kaikoura new zealand

Understanding Landslides Part 1: Geological Processes & Risk Factors

From catastrophic slope failures to localised disruptions, understanding landslide mechanics is the first step toward effective mitigation and protection.

rockfall protection system for natural hazards

Rockfall Protection Systems for Natural Hazards

Exploring rockfall protection systems and their role in managing natural hazard risks, drawing on Geovert’s global experience.

ngaio gorge nz rockfall mesh, rock anchors and rockfall barrier installation

Understanding Landslides Part 2: Geohazard Mitigation Solutions for Landslides

Successful landslide mitigation depends on selecting the right geohazard mitigation solutions for site-specific conditions and implementing them in challenging conditions.

spider excavator soil nail drilling infrastructure slope stabilisation nz

Limited Access Drilling: Rope Access, Helicopter Lifts and Spider Excavators

In ground engineering, some of the most critical work takes place in steep, remote, or confined terrain where conventional rigs cannot operate - limited access drilling provides the specialist methods needed to deliver safe and effective solutions in these environments.

bottom of page