top of page
![](https://static.wixstatic.com/media/8f5082_07226aa3332e4333810d4e32ddfeaa86~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/8f5082_07226aa3332e4333810d4e32ddfeaa86~mv2.webp)
![Disaster Response: Protecting Santa Fe's Water Supply After Historic Forest Fire](https://static.wixstatic.com/media/8f5082_07226aa3332e4333810d4e32ddfeaa86~mv2.jpg/v1/fill/w_305,h_229,fp_0.50_0.50,q_90,enc_auto/8f5082_07226aa3332e4333810d4e32ddfeaa86~mv2.webp)
Disaster Response: Protecting Santa Fe's Water Supply After Historic Forest Fire
After NM's largest wildfire, Geovert's emergency team raced to protect Santa Fe's water supply from devastating post-fire debris flows.
![](https://static.wixstatic.com/media/8f5082_9d876ebf9a1c4caf914677f524bb888d~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/8f5082_9d876ebf9a1c4caf914677f524bb888d~mv2.webp)
![Geovert’s Exceptional Safety Achievement: 6 Years of Infrastructure Protection at The Hoover Dam](https://static.wixstatic.com/media/8f5082_9d876ebf9a1c4caf914677f524bb888d~mv2.jpg/v1/fill/w_306,h_229,fp_0.50_0.50,q_90,enc_auto/8f5082_9d876ebf9a1c4caf914677f524bb888d~mv2.webp)
Geovert’s Exceptional Safety Achievement: 6 Years of Infrastructure Protection at The Hoover Dam
Geovert’s 6-year involvement in one of America's most iconic pieces of infrastructure has concluded with exceptional recognition from USBR.
![](https://static.wixstatic.com/media/8f5082_ce43ad10755342808e2551a091c4db4b~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/8f5082_ce43ad10755342808e2551a091c4db4b~mv2.webp)
![Geovert Expands US Team: Welcoming New Talent](https://static.wixstatic.com/media/8f5082_ce43ad10755342808e2551a091c4db4b~mv2.jpg/v1/fill/w_305,h_229,fp_0.50_0.50,q_90,enc_auto/8f5082_ce43ad10755342808e2551a091c4db4b~mv2.webp)
Geovert Expands US Team: Welcoming New Talent
Geovert expands US operations, strengthening our business development, project management, delivery and engineering capabilities.
![](https://static.wixstatic.com/media/8f5082_d2600444666e4b89a1042dd1ce07ec6f~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/8f5082_d2600444666e4b89a1042dd1ce07ec6f~mv2.webp)
![Awards finalist announcement for Geovert NZ](https://static.wixstatic.com/media/8f5082_d2600444666e4b89a1042dd1ce07ec6f~mv2.jpg/v1/fill/w_305,h_229,fp_0.50_0.50,q_90,enc_auto/8f5082_d2600444666e4b89a1042dd1ce07ec6f~mv2.webp)
Awards finalist announcement for Geovert NZ
We are delighted to announce that Geovert have been chosen as a finalist at the 2024 Civil Contractors New Zealand Hirepool Construction...
![Kaikoura Rebuild - Geovert Ground Engineering](https://static.wixstatic.com/media/8f5082_a7de25e5d20a45b7b6df682ab916f876~mv2.png/v1/fill/w_306,h_229,fp_0.50_0.50,q_95,enc_auto/8f5082_a7de25e5d20a45b7b6df682ab916f876~mv2.webp)
Kaikoura Rebuild - Geovert Ground Engineering
In 2016 a catastrophic earthquake struck the Kaikoura region in NZ, causing hundreds of landslides, cutting off the road and rail...
![](https://i.ytimg.com/vi/a7XayLweEWE/maxresdefault.jpg)
![Transmission Gully - Geovert Ground Engineering](https://i.ytimg.com/vi/a7XayLweEWE/maxresdefault.jpg)
Transmission Gully - Geovert Ground Engineering
Transmission Gully is Australasia’s largest greenfield project, with a 27km 4-lane highway constructed through the rugged New Zealand...
bottom of page