The Gove refinery in the Northern Territory has been using advanced rope access to undertake site wide inspection and maintenance services since Geovert first introduced this cost saving initiative to Alcan (now Pacific Aluminium) in 2006.

The scope of work completed during the maintenance contract (and on recent shut down contracts) predominantly included NDT inspection and maintenance of the bauxite precipitation tanks along with in-service pressure equipment inspection, fabrication and structural repairs to a variety of the clients assets at the refinery and port.