Transmission Gully
The new 4 lane 27km motorway runs up and over a saddle line and contours the bottom of a steep gully that required substantial ground engineering due to the slope angle and the nature of the highly fractured ground conditions with multiple fault/thrust zones throughout the seismically active area. The CPBHEBJV awarded Geovert the major slope stabilization package for the project, with a for 3 year long program, based on our ability to provide engineering support, scale up the operation when required with additional skilled crew and production drilling equipment to meet the significant demands of the varied ground conditions and limited access constraints.
Project Overview

Ground Engineering Market Sectors